Our bonded zone area is always ready to support projects around the world



Engineering Work


Our in-house engineers are capable of doing engineering work for Connection and Detailing Drawing.


To give you the best of our service, engineers are equipped with six drawing platform licenses.

General Facility

Main Office, Mosque, Training Room, HSE Office, Employee Mess

Non-Pressure Part Shop

A total of four shops are dedicated for non-pressure part production.

Avatar

Crane Capacity:

Up to 50 T

Facilities:

CNC Cutting Machine, Drilling Machine, Rolling

Machine, Bending Machine, Straightening Machine,

Surface Machining Machine, etc

Pressure Part Shop

A total of six shops are dedicated for pressure part production.

Avatar

Crane Capacity:

Up to 50 T

Facilities:

Tube Panel Welding, Automatic Panel Membrane,

Panel Bender, Facing, Swaging, Expanding, Finning

Machine, RT Chamber, HT Furnace, etc

Avatar

Facilities:

Up to 75,000 m2 per month.

Blasting & Painting


Blasting Chamber:

1. L 30 m x W 10 m x H 4.45 m

2. L 15 m x W 10 m x H 4.45 m

Private Jetty that is connected to Yard to support

production process from material to delivery

Avatar

Jetty Capacity:

15,000 DWT

Concrete Strength:

25 ton / m2

Facilities:

Skid Rail, Gantry Crane, Tower Crane, Erection Yard,

Yard Sand Blast.